This urban brownfield serves as a gateway to the regionally popular Woonasquatucket River Bikeway. G+G planned a new entrance plaza and associated parking along with stormwater BMPs to capture and treat stormwater prior to it entering the ‘Woony River’.  The Master Plan included signage locations, seating, planting and circulation connections to the parks other attractions.  Construction focused on capping all areas per three different cap details, native planting, car park layout and stripping.  Earthwork was balanced so that no contaminated soil left the property. 

Riverside Park